Feasibility Study for Articulated Electric Buses on León's Optibús Line 1

USD 0.00

Operational, technological, and financial assessment to plan the electrification of an established BRT corridor

Operational, technological, and financial assessment to plan the electrification of an established BRT corridor

Client

Dirección de Movilidad de León, Guanajuato

Country

Mexico

Period

July 2024 – October 2024

Service

Zero-Emission Transport Systems / Smart Mobility

Description

E-Mobilitas assessed the introduction of 20 articulated electric buses on Line 1 of the Optibús system in León, Guanajuato. The study combined demand analysis, operating design, and electrical requirements with market research and financial assessment.

The project also examined three potential charging depot locations at concessionaire facilities and developed a roadmap for a gradual, viable transition. Charging options were assessed at concessionaire depots as part of the proposed implementation approach.

Activities:

• Analyzed bus rapid transit demand for deploying 20 articulated electric buses.

• Designed operations and assessed electricity needs for Line 1.

• Researched and compared electric bus and charger technologies.

• Prepared conceptual electrical infrastructure designs for three concessionaire depots.

• Developed a financial model, total cost of ownership (TCO) assessment, and roadmap.

Search by service type
 
Search by country