Client
Instituto para la Gestión Eficiente de la Ciudad (IGEC) / TransRED
Country
Mexico
Period
July 2024 – December 2024
Service
Zero-Emission Transport Systems / Financing and Bankability
Description
E-Mobilitas assessed alternatives for electrifying Mexibús Line 3 in the State of Mexico. The study compared scenarios involving 20, 40, and 60 electric buses and integrated operating design, electricity requirements, and financial analysis.
It also reviewed bus and charger technologies, developed a conceptual design for charging infrastructure at the operator's depot, and prepared a roadmap for phased implementation. The work linked charging infrastructure requirements to the operator's planned fleet transition.
Activities:
• Compared phased electrification scenarios with 20, 40, and 60 buses.
• Assessed service operations and fleet electricity requirements.
• Conducted market research on electric buses and charger technologies.
• Developed conceptual electrical and charging infrastructure designs for the TransRed depot.
• Prepared a financial model, total cost of ownership (TCO) assessment, and roadmap.
Search by country
- Albania
- Argentina
- Bolivia
- Bosnia y Herzegovina
- Brazil
- C40 Cities
- CALSTART
- Cabo Verde
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
- Dirección de Movilidad de León, Guanajuato
- Dominican Republic
- EGIS
- Ecuador
- Greenpeace Mexico
- Guatemala
- IDOM
- Instituto de Movilidad del Estado de Quintana Roo (IMOVEQRoo)
- Instituto para la Gestión Eficiente de la Ciudad (IGEC)
- Inter-American Development Bank (IDB)
- Ithaca Environmental
- KPMG
- Kreditanstalt für Wiederaufbau (KfW)
- Mexico
- Panama
- Paraguay
- Peru
- Red Planners
- Rwanda
- Tractebel
- Tunisia
- United States
- World Bank
Operational, technological, and financial assessment to plan the electrification of an established BRT corridor