Client
Instituto de Movilidad del Estado de Quintana Roo (IMOVEQRoo)
Country
Mexico
Period
June 2024 – December 2024
Service
Zero-Emission Transport Systems/ Smart Mobility
Description
For the Quintana Roo Mobility Institute, E-Mobilitas assessed the feasibility of electrifying three public transport corridors in Cancún. Using demand modeling in PTV Visum, the study sized services and linked operating design to energy requirements, charging infrastructure, and financial assessment.
These components informed a roadmap to guide corridor implementation. The resulting roadmap connected modeled demand with corridor operations and implementation decisions.
Activities:
• Modeled demand in PTV Visum to size three public transport corridors.
• Assessed fleet size, electric bus options, and charging technologies.
• Developed operating plans and conceptual electrical and civil depot infrastructure proposals.
• Prepared business and financial models to assess project viability.
• Consolidated findings into an implementation roadmap.
Search by country
- Albania
- Argentina
- Bolivia
- Bosnia y Herzegovina
- Brazil
- C40 Cities
- CALSTART
- Cabo Verde
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
- Dirección de Movilidad de León, Guanajuato
- Dominican Republic
- EGIS
- Ecuador
- Greenpeace Mexico
- Guatemala
- IDOM
- Instituto de Movilidad del Estado de Quintana Roo (IMOVEQRoo)
- Instituto para la Gestión Eficiente de la Ciudad (IGEC)
- Inter-American Development Bank (IDB)
- Ithaca Environmental
- KPMG
- Kreditanstalt für Wiederaufbau (KfW)
- Mexico
- Panama
- Paraguay
- Peru
- Red Planners
- Rwanda
- Tractebel
- Tunisia
- United States
- World Bank
Operational, technological, and financial assessment to plan the electrification of an established BRT corridor