Pre-Investment Studies for Electrifying Guatemala City's BRT Line 5

USD 0.00

Demand analysis, vehicle specifications, regulatory review, and business model development informed the technical and investment requirements for introducing battery-electric transit operations

Demand analysis, vehicle specifications, regulatory review, and business model development informed the technical and investment requirements for introducing battery-electric transit operations

Client

Red Planners / Central American Bank for Economic Integration (CABEI)

Country

Guatemala

Period

November 2021 – November 2022

Service

Zero-Emission Transport Systems / Financing and Bankability

Description

E-Mobilitas contributed to pre-investment studies for introducing at least 20 electric buses on Line 5 of Guatemala City's bus rapid transit (BRT) system. The consultancy included demand data analysis, review of vehicle specifications, and assessment of applicable regulation.

These inputs supported a business model linking service conditions, technology alternatives, and the requirements needed to prepare the electrification initiative. The resulting model linked operating needs and technology choices to project preparation requirements.

Activities:

• Analyzed demand data to prepare electrification of Line 5.

• Reviewed electric bus technical specifications for BRT operations.

• Assessed regulations governing electric vehicle deployment.

• Developed a business model to structure the electrification initiative.

Search by service type
 
Search by country